Template · Performance and development
Performance improvement plan template
In short
A performance improvement plan template documents a specific performance gap, the measurable standard the employee must reach, the support the company will provide, a timeline of usually 30 to 90 days, scheduled check-ins and the possible outcomes. This PIP form includes every section a careful HR team uses, with an example and guidance.
Performance Improvement Plan template
Performance Improvement Plan
Complete this plan with HR before meeting the employee. Each performance issue must be described with specific examples and paired with a measurable target. Give the employee a copy at the meeting and keep the signed original in the personnel file.
Employee and plan details
- Employee name
- Job title
- Department
- Manager
- HR representative
- Plan start date
- Plan end date
- Plan length
- 30 days45 days60 days90 days
Background
- Prior feedback given (dates and form: coaching sessions, one-on-ones, review ratings, written warnings)
- Why a formal plan is needed now
Performance issue 1
- Expected standard (as stated in the job description, policy or targets)
- Current performance, with specific examples and data
- Measurable target to reach by the plan end date
- How and how often progress will be measured
Performance issue 2 (if applicable)
- Expected standard
- Current performance, with specific examples and data
- Measurable target to reach by the plan end date
- How and how often progress will be measured
Support and resources
- Training, coaching or shadowing to be provided, with dates
- Tools, access or workload changes
- Who the employee can go to for help
Check-in schedule and log
- Check-in frequency
- WeeklyEvery two weeks
- Check-in 1 date
- Check-in 1 progress and notes
- Check-in 2 date
- Check-in 2 progress and notes
- Check-in 3 date
- Check-in 3 progress and notes
- Check-in 4 date
- Check-in 4 progress and notes
Possible outcomes
At the end of the plan, [Manager Name] and HR will review progress against each target. Possible outcomes are: (1) the targets are met and the plan closes, with performance expected to stay at that level; (2) clear progress has been made but the targets are not fully met, and the plan may be extended once by up to [number] days; or (3) the targets are not met, which may result in further disciplinary action, up to and including termination of employment.
This plan does not change the at-will nature of employment. The Company may take action before the plan end date if performance declines further or if there is misconduct unrelated to this plan.
Employee comments and signatures
- Employee comments (optional)
- I have received and discussed this plan. My signature does not mean I agree with its contents.
- Employee signature
- Date
- Manager signature
- Date
- HR signature
- Date
Plan outcome (completed at the end date)
- Outcome
- Targets met, plan closedPlan extendedTargets not met, further action
- Summary of results against each target
- Manager signature
- Date
How to use this template
- Confirm with HR that earlier feedback was given and documented; a PIP should not be the first time the employee hears about the problem.
- Limit the plan to two or three issues and write each one as standard, current performance with examples, target and measure.
- Choose a length that gives a real chance to improve: 30 days for daily-measured frontline metrics, 60 to 90 days for work with longer cycles.
- List concrete support with dates and owners, such as weekly coaching or a refresher course.
- Hold the meeting with HR present, give the employee a copy and let them add comments before signing.
- Hold every scheduled check-in, record progress honestly in the log and share notes with the employee.
- Complete the outcome section on the end date and communicate the decision in writing.
When a PIP is the right tool
Use a performance improvement plan when someone has had clear feedback, the gap is still there, and you genuinely believe they can close it with structure and support. It suits skill and output problems: missed quality targets, slow processing times, poor follow-through. It is the wrong tool for misconduct such as harassment, theft or safety violations, which belong in your disciplinary process, often starting with a written warning template.
If the gap is new, start with informal coaching and document it on a coaching form. A PIP that arrives without any earlier feedback feels like an ambush and usually is one. For a broader definition and how PIPs fit performance management, see the performance improvement plan glossary entry.
A worked example
Kevin Brooks is a claims processor at an insurer's service center. His standard is 45 closed claims per week at 97 percent accuracy. Over the last quarter he averaged 31 claims at 91 percent accuracy, and his last performance review rated productivity a 2, with two documented coaching sessions since.
The plan runs 60 days. Target one: at least 42 closed claims per week for each of the last four weeks of the plan. Target two: accuracy of 96 percent or better on the weekly quality audit for the same four weeks. Support: two half-day sessions with a senior processor in week one, a daily 10-minute huddle with his supervisor in weeks one to three, and removal from the overflow queue so he works one claim type. Check-ins every Friday, with the weekly numbers shared.
Notice that the end target is slightly below full standard. That is a deliberate, common choice: it asks for a clear trend and sustained improvement without demanding perfection inside 60 days.
Writing a fair, defensible plan
Fairness and legal defensibility come from the same habits.
- Measurable targets. "Improve attitude" cannot be met or missed. "Respond to every customer email within one business day" can.
- Consistency. The standard should be the one others in the same role are held to. If peers miss the same target without a PIP, expect a discrimination claim to point that out.
- Real support. Write it in and deliver it. A plan whose promised training never happens is hard to defend.
- Honest check-in notes. Record progress as well as gaps. A log that only lists failures looks pre-decided.
- Watch the timing. Placing someone on a PIP right after they request leave, report a concern, file a complaint or disclose a disability or pregnancy creates retaliation risk. Talk to HR or counsel first, and check whether a reasonable accommodation conversation is needed under the ADA.
This is informational, not legal advice. Rules vary by state, and unionized workplaces must follow the collective bargaining agreement.
Delivering the plan
Hold the meeting in private with HR present. Explain that the purpose is to help the person succeed and that the outcome depends on reaching the targets. Walk through each issue, the target and the support, and let them respond. Expect emotion; give them time to read the plan and allow written comments.
Send a short follow-up the same day summarizing the plan and the first check-in date. Our performance improvement plan email gives you wording that is clear without being harsh.
PIPs in high-volume frontline teams
In contact centers, warehouses and retail, a supervisor may run several plans at once. Standardize them: one template per role with the core metrics, standards and typical support pre-filled, so supervisors fill in the individual data and examples. Thirty days is usually enough for metrics measured daily, such as handle time, adherence or units per hour.
Track PIP outcomes by supervisor. If one supervisor's plans almost always end in termination and another's almost always succeed, the problem is likely in how the plans are written or supported, not in the people on them.
Frequently asked questions
What should a PIP template include?
Employee and plan dates, prior feedback, each performance issue described as standard versus current performance with examples, measurable targets, how progress will be measured, the support provided, a check-in schedule, possible outcomes, an at-will statement where applicable, and signatures.
How long should a performance improvement plan last?
Typically 30 to 90 days. Thirty days suits roles with daily metrics; 60 to 90 days suits work where results take longer to show, such as sales cycles or project work. Too short a plan looks like a formality.
Is a PIP form a sign that you will be fired?
Not necessarily. A well-run PIP gives a real chance to improve, and many employees complete one successfully. That said, if targets are not met, termination is a common outcome, so employees should take the plan seriously.
Can an employee refuse to sign a performance improvement plan?
They can decline, but the plan still applies. The signature only confirms they received it. Note the refusal on the form with the date and a witness, such as the HR representative.
What is a good performance improvement plan example of a measurable goal?
"Reach a quality score of 90 percent or higher on at least eight of the ten weekly call audits during weeks five to eight of the plan." It states the metric, the level, how it is measured and the time frame.
Can a PIP be extended?
Yes, usually once, if the employee has shown clear progress but has not fully reached the targets. State the extension length and any revised targets in writing and have both parties sign.